Shark Ninja consolidates data center, saves licensing cost and increases flexibility
Challenge
Sophisticated and effi cient Information Technology is essential to connect
1200 SharkNinja staff members operating from locations globally. To enhance performance and reliability they planned an IT re-design that would both modernize and consolidate their infrastructure. Production data centers in Boston, Montreal, and China were to be streamlined. The objective was a primary production facility in Boston with Montreal becoming the DR site, and China reduced to a nominal footprint.
Results
-
User response: from minutes to seconds
-
40-50% analytics performance improvement
-
Maintenance costs eliminated
-
SQL license costs substantially reduced